Seattle.gov Home Page
Seattle.gov This Department
Link to Transportation Home Page Link to Transportation Home Page Link to Transportation About Us Page Link to Transportation Contact Us Page
A vibrant Seattle through transportation excellence Peter Hahn, Director

Services 

Projects 

Planning 

Resources 

Events

News

Site Index


Mercer Corridor Program Home
Mercer East Phase I - Fairview to Dexter Avenue
Project Background
Construction Updates
Construction Schedule
Construction Noise Monitoring Reports
Photos
TIGER Grant
Contact Us
Mercer West Phase II - Dexter Avenue to Elliott Way W

Mercer Corridor Project – Phase I

Mercer East construction is underway in the South Lake Union neighborhood through 2013. Subscribe to email alerts to receive regular construction and detour information.

Last updated 2/7/2012

Mercer Stage 2 traffic switch complete
Stage 2 of Mercer East has begun and eastbound traffic on Mercer St. has been re-routed onto the new Mercer St. lanes north of the existing lanes. Three lanes of traffic are continuing eastbound on Mercer St. with access to the I-5 on-ramps and southbound Fairview Ave. N. 

  • The far-right lane of eastbound Mercer St. is right-turn only at Dexter Ave. N.
  • Access to Mercer St. from the south via Boren, Terry, and Westlake Avenues is concurrently closed at Republican St. 
  • Right turns from Mercer St. onto Fairview Ave. N southbound are allowed; however, alternate routes should be used to reach Eastlake Ave. E and Capitol Hill (i.e. Dexter Ave. N to Republican St.) due to increased congestion on Mercer St.
  • Left turns from Mercer St. onto Fairview Ave. N northbound are not being permitted during Stage 2.

Access to Northbound I-5 and SR 99 Detour Map
Access to Southbound I-5 and SR 99 Detour Map
Pedestrian Detour Map
Bicycle Detour Map

Mercer St. East of Fairview Ave. N Closure through Stage 2
Mercer St. will remain closed between Fairview Ave. N and Minor Ave. N, except to local access from Minor Ave. N until two-way traffic is opened on Mercer St. in the Fall of 2012. Due to the new northerly alignment of eastbound Mercer St. lanes, access to Mercer St. east of Fairview Ave. N cannot be provided. SDOT recommends that drivers headed to Capitol Hill use an alternate route during Stage 2, such as Republican St. to Eastlake Ave. N.

Seattle area construction closures and traffic impacts

Previous construction updates

Recommended Routes During Construction

While construction activities in the project area are underway, the maps below suggest routes for drivers, bicyclists and pedestrians based on current construction. Information on Metro bus routes #17 and #30 is also included.

Home | About Us | Contact Us | Site Index | Events | News | FAQs | E-Mail Alerts