PROJECT STATUSThank you, Seattle. This project is complete!The dedication celebration was held May 19, 2007 during the Delridge Days and Resource Fair. This project was delayed when Parks received higher-than-expected bids for the improvement project. Parks and the designer scaled back the project design, and the project was successfully re-bid in spring 2006. The plans were updated to accommodate rising construction material costs. The changes/reductions are as follows (update plan below):
This development project will create one contiguous open space/park that includes the following passive and active recreational elements: unscheduled sports fields, playgrounds, plazas, picnic shelters, tables, benches, renovation of the P-patch, development of a grass court for lawn bowling and croquet type activities, tables, benches and wooded areas with native vegetation. The parks were designed by Cascade Design Collaborative.
PROJECT DESCRIPTIONDesign develops Cottage Grove, Puget Boulevard Commons and Greg Davis Park to create one contiguous open space/park that includes the following passive and active recreational elements:Cottage Grove: Unscheduled sports fields, street improvements on 26th Ave. SW, playground, plazas, picnic shelters, tables, benches and wooded areas with native vegetation. Puget Boulevard Commons Development: Street improvements on Puget Blvd. SW, renovation of the p-patch, development of a grass court for lawn bowling and croquet type activities, tables, benches and wooded areas with native vegetation. Greg Davis Park: Grove of trees on side slopes along 26th Ave. SW to reflect proposed plantings across the street. Planting areas with boulders, and native trees and shrubs along Brandon to inhibit entry into park by vehicles. Street improvements along Brandon St. SW and 26th Ave. SW. (
RETURN TO TOP )
COMMUNITY PARTICIPATIONMeeting #1: 11/16/04 notesMeeting #2: 12/16/04 notes Meeting #3: 02/23/05 notes Meeting #4: 12/12/05 At this final meeting, Parks updated the community on the changes in the plans due to budget constraints, and informed attendees of the updated schedule (